The project consisted of simultaneously installing (3) 1.5 Goldwind turbines in separate locations in central Iowa. Goldwind is new to the US market and this project was the first with a new turbine design. The project team provided all civil construction, turbine erection, BOP equipment and materials, and complete electrical construction. Working closely with Goldwind and maintaining open communication were key components in delivering this project on time and within budget.
GL Wind is a 5 MW project consisting of (2) 2.5 MW Clipper turbines. The project team provided all civil construction, turbine erection, BOP equipment and materials, and complete electrical construction. The project was completed on time and within budget.
The team was the BOP contractor which constructed the roads, foundation, interconnects, erected the wind turbine and installed the collection system. The project consisted of 1 Vestas, 1.65 MW wind turbine.
The team served as the BOP contractor. The project included (1) 1.5 MW GE turbine.